Skip to content

The profitable all-in-one charging solution
for sports and leisure facilities

Offer your guests more service and turn your parking lot into a source of revenue with LADE.

  • Complete solution for easy and profitable operation
  • Save up to 30 % on investment costs
  • Ideal for golf clubs, fitness studios, leisure parks

Your parking lot: perfect for charging stations

Do you have guests and customers parking at your facilities for an hour or more? High visitor volumes in good weather and a solar system on site, or the possibility of installing one?

Then you have the ideal location to turn e-car charging into a profitable business model with our complete solution.

Easy implementation and profitable operations of your charging park

With the LADE complete system, you can operate charging stations easily and profitably:

LADEplus Doppelladepunkt eichrechtskonform

Up to 30 % lower investment costs

Thanks to the innovative LADE technology, you can significantly reduce costs for installation and construction work as well as the grid connection in many cases.

As simple as possible – for you and your guests

The LADE complete system offers hardware and software from a single source – for smooth operation and extremely easy handling.

Optimized margins through AI energy management

If you have a PV system or a dynamic electricity tariff, LADE Optimized Charging plans each charging process in such a way that the share of cheap green electricity is automatically maximized. When selling electricity, your margin benefits directly from this.

Individual billing according to your specifications

You can design access and billing flexibly and in line with your business model, e.g. with different options and tariffs for guests, members and employees.

Future-proof system design

Step-by-step expansion, bidirectional charging or integration of charging stations from other manufacturers – with the complete solution from LADE, you are ideally equipped for all future requirements.

Proven in practice: Germany's largest golf course charging park

Stefan-Kirstein-1zu1-min-min

“We operate the largest charging park at a golf course in Germany. The complete system from LADE was not only significantly cheaper, but also better. We have a solution from a single source, technology at the very highest level and everything works perfectly together.”

Stefan Kirstein
Managing Director Mainz Golf Club

Download reference

Only from LADE: more efficiency through
AI-based load and energy management

With the help of AI, the LADE energy management creates individual and needs-based charging plans for each charging process. This means more charging points and optimized energy consumption for you.

More charging points

LADE is the first provider to take vehicle parking times and actual charging needs into account when planning charging. This allows you to supply significantly more charging points with the same grid connection than with other systems.

Optimized energy consumption

Thanks to AI-based forecasts and individual planning, charging processes are scheduled for times when electricity is particularly green and cheap wherever possible.

It's that easy to get your free quote:

Fill out the form with basic information about the project and your contact details.

We will get back to you shortly by e-mail. If you still have questions, we will contact you by telephone.

You will receive your free complete offer from your local regional electrical partner.

Known from: